午夜一区二区在线观看-午夜一区二区三区-午夜一区二区免费视频-午夜一级做a爰片久久毛片-国产又爽又大又黄A片另类软件-国产在线a免费观看

Chinese English| Favorite| Contact us Welcome to the website of “Wuxi Yisto Precision Machinery Co., Ltd.”!

Wuxi Yisto Precision Machinery Co., Ltd.

Service Hotline400 100 5226

CONTACT US
Service Hotline400 100 5226
  • Tel: 400 100 5226
  • Fax: 0510-68392919
  • E-mail: sherry@yisto-east.com
  • Address: No.422, Xizhang Road, Gushan Town, Jiangyin, Wuxi, China
Your location: News >> Company News

Maintenance and maintenance of auxiliary equipment for high-speed punching machines?

Release date: 2019-09-17 17:19:54 Visits: 753

The maintenance and maintenance of the auxiliary equipment of high-speed punching machine mainly includes: maintenance and maintenance of numerical control indexing head, automatic tool changer and hydraulic air pressure system.
1. Maintenance and maintenance of CNC indexing head
The CNC indexing head is a common accessory for CNC milling machines and machining centers. Its function is to make the rotary indexing or continuous rotary feeding motion according to the instructions of the CNC device, so that the high-speed punching machine can complete the specified machining accuracy. Therefore, in operation and use. It is necessary to pay attention to the correct operation according to the requirements and operating procedures of the numerical control indexing head.
2. Maintenance and maintenance of automatic tool changer for high speed press
The automatic tool changer is a feature that distinguishes the machining center from other high speed presses. It has the function of automatically changing the required tools according to the processing requirements, to help the high-speed punch save the auxiliary time, and to meet the multi-process and step processing requirements in one installation. Therefore, in operation and use, it is necessary to check whether the operation of the mechanical structure of each component of the automatic tool changer is normal, whether there is an abnormal phenomenon, whether the lubrication is good, etc., and pay attention to the reliability and safety inspection of the tool change.
3. Maintenance and maintenance of high speed press hydraulic system
(1) Regularly inspect, filter, and replace the oil in the fuel tank;
(2) Check the performance of the cooler and heater to control the oil temperature;
(3) Regularly check and replace the seals to prevent leakage of the hydraulic system;
(4) Regularly check the cleaning or replacement of hydraulic parts, filter elements, and regularly check the cleaning tank and piping;
(5) Strictly implement the daily inspection system to check whether the leakage, noise, vibration, pressure, temperature, etc. of the system are normal.
4. Maintenance and maintenance of the pneumatic system
(1) Use a suitable filter to remove impurities and moisture from the compressed air;
(2) Check the oil supply of the oil mister in the system to ensure that there is an appropriate amount of lubricating oil in the air to lubricate the pneumatic components to prevent rust, wear and tear, air leakage and component failure;
(3) Maintain the tightness of the pneumatic system and periodically check and replace the seals;
(4) Pay attention to adjusting the working pressure;
(5) Regularly check the cleaning or replacement of pneumatic components and filter elements.
主站蜘蛛池模板: 阿鲁科尔沁旗| 柳河县| 田东县| 呈贡县| 长治县| 布拖县| 钟山县| 武清区| 武宣县| 泸州市| 荃湾区| 新兴县| 德江县| 湄潭县| 鄱阳县| 固安县| 盐源县| 鄂州市| 公安县| 旬阳县| 卓资县| 呼玛县| 七台河市| 冷水江市| 博湖县| 桂东县| 江门市| 吴川市| 谷城县| 贡觉县| 连州市| 蒙自县| 琼海市| 嘉定区| 扎鲁特旗| 遂川县| 隆安县| 长宁县| 多伦县| 聂拉木县| 河西区|